Internal Quality Audit Work Instruction Author: Mr D Wilson
Source of document: Open University
Date: 25/09/95
GENERAL
This instruction details the procedure to be followed to ensure that all the elements of the assurance system are operating effectively. PLANNING
The Quality Audit Plan. The QE is to prepare a 12 monthly quality audit plan. The plan takes the form of the matrix (see figure 1) and ensures that all the elements of the quality assurance system are regularly audited.
PROCEDURE
Note: A copy of the audit plan is to be issued to each Dept,
all personnel will be kept aware of their quality audit periods.
The date will only need to be confirmed shortly before the audit.
| Ser | Sect | Month | |||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
| Work Instruction | |||||||||||||
| 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | ||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) |
| 1 | Dept 1 | H | B | E | C | G | D | H | B | E | C | G | D |
| 2 | Dept 2 | A | F | B | D | H | E | A | F | B | D | H | E |
| 3 | Dept 3 | B | G | C | E | A | F | B | G | C | E | A | F |
| 4 | Dept 4 | C | H | D | F | B | G | C | H | D | F | B | G |
Auditors:
A = IC Dept 1, B = IC Dept 2, C = IC Dept 3, D = IC Dept 4, E = 2IC Dept 1, F = 2IC Dept 2,
G = 2IC Dept 3, H = 2IC Dept 4.
Auditor A will conduct any audits that can not be conducted due to leave or courses.
Fig 1 Example of Quality Audit Plan Matrix
ANNEX A
QUALITY AUDIT REPORT
Dept Audited: Dept Head: Activity Audited:
Compliance / Non-compliance / Deficiency (Delete and comment as necessary), details:
Auditor: (Signature) Date:
Corrective Action is as follows:
Target Date (Dept Head): Dept Head: (Signature) Date:
FOLLOW UP AUDIT
The corrective action has / has not been completed by the new target date. Auditor: (Signature) Date:
Comment (Dept Head):
Dept Head: (Signature) Date: QE: (Signature) Date: Text starts here